Unicorn Infra | DBM & SMA Procedure
Procedure Varanasi - Aurangabad (NH2)

DBM & SMA
LAYING
PROCEDURE.

Location

Sasaram

Highway

NH-2

Material

PMB 82 E-10

Method

Step-by-Step

Technical Summary

Summary of the DBM Procedure & Laying Procedure with PMB 82 E-10.

This project details the precise step-by-step procedure for laying Dense Bituminous Macadam (DBM).

It also includes the comprehensive Step-by-Step Procedure for Laying SMA (Stone Matrix Asphalt) with PMB 82 E-10 (Polymer Modified Bitumen) on the Varanasi - Aurangabad (NH2) section at Sasaram.

NH2 Corridor
82 E-10 PMB Grade
DBM Laying Procedure
Process View 01
SMA Stone Matrix Asphalt

Scope of
Procedure

Key methodologies implemented for pavement durability.

01

DBM Laying

Detailed step-by-step procedure for laying Dense Bituminous Macadam layers.

02

SMA with PMB

Step-by-Step procedure for laying Stone Matrix Asphalt using PMB 82 E-10.

03

Location Specifics

Executed on the Varanasi - Aurangabad (NH2) section at Sasaram.

04

Material Grade

Utilized specialized PMB 82 E-10 grade bitumen for superior performance.

Start
Your Project.

Partner with Unicorn Infra for precision engineering and technical excellence in road construction.

Get a Quote
Headquarters

Plot No 3A, Northern Peripheral Rd,
Shastri Nagar, Sector 106,
Gurugram, Haryana 122006

Unicorn Infra.
Home About © 2025 All Rights Reserved.